skip navigation

Proceedings of the Special International Workshop on Seismic Connection Details for Segmental Bridge Construction

MCEER-09-0012
Seattle, Washington | July 22-24, 2009

group photo at the Special International Workshop on Seismic Connection Details for Segmental Bridge Construction

The Special International Workshop on Seismic Connection Details for Segmental Bridge Construction provided a forum for an international group of experts in bridge engineering to exchange information on the design of segmental bridges in regions of moderate to high seismicity for accelerated bridge construction (ABC). Participants presented in-progress research and joined together in discussions that addressed various issues at the intersection of modular precast concrete accelerated bridge construction (ABC) and seismic analysis and design. The workshop was co-chaired by Phillip W. H. Yen, Federal Highway Administration and George C. Lee, MCEER, University at Buffalo.

See also:

report imageicon to enlarge view