![]() |
![]() |

Tim Ingham presents course material during the
Pilot Workshop on Truss Bridges
Please note: the presentations below are available in Adobe PDF format.
Introductory Remarks (64 kb)
Seismic Design and Retrofit: References and Support (221 kb)
Introduction (1.5 mb)
Seismic Retrofit Philosophy and Process for Steel Truss Highway Bridges (1.2 mb)
Screening and Prioritization (982 kb)
Analysis (3.3 mb)
Design Parameters (974 kb)
Evaluation of Members, Connections and Subsystems (2.9 mb)
Retrofit Measures, Approach and Strategy (5.8 mb)
Foundation and Substructure Retrofit (5.4 mb)
Case History: Aurora Bridge (5.1 mb)
Case History: Million Dollar Bridge (5 mb)
Case History: Richmond San Rafael Bridge 1 (4 mb)
Case History: Richmond San Rafael Bridge 2 (3.8 mb)
Biographies of Instructors and Key Personnel
| Contact
Us | Acknowledgements
| Disclaimer
| Copyright© 2007 by
the Research Foundation of the State of New York. All rights reserved.
|